WHEATSTONE DOWNSTREAM PROJECT

Onslow | Australia

YEAR

2011 – 2015

STATUS

Completed

SERVICE

Geotechnical design

FINAL CLIENT

CHEVRON

CLIENT

HR WALLINGFORD and NV BESIX SA

ENGINEER

NV BESIX SA – SOIL Srl

STRUCTURES

Jetty – Breakwater

During the FEED design phase of the project for international bid (for HR Walingford): geotechnical characterization of the area, definition of offshore soil properties for dredging purposes, stability analyses of the breakwater, liquefaction assessment analyses and design criteria for the piles of the trestle and berthing/mooring facilies. During the EPC project phase (for BESIX): final design criteria and geotechnical design of the breakwater (stability analyses, settlements evaluation) and support for MOF design.