BRIDGE CROSSING THE PO RIVER
Piacenza | Italy
YEAR
2009 – 2011
STATUS
Completed
SERVICE
Foundations design
FINAL CLIENT
ANAS SpA
CLIENT
ANAS SpA
ENGINEER
SOIL Srl
STRUCTURES
Diaphragm walls & micropiles
Reinforcement of all existing foundations on caissons, originally built in 1900÷1904. Each pier was consolidated by special injections in the masonry. The entire load was then transferred to new diaphragm wall panels (or micropiles) through the precompression on the pier of on all round concrete beam.