BRIDGE CROSSING THE PO RIVER

Piacenza | Italy

YEAR

2009 – 2011

STATUS

Completed

SERVICE

Foundations design

FINAL CLIENT

ANAS SpA

CLIENT

ANAS SpA

ENGINEER

SOIL Srl

STRUCTURES

Diaphragm walls & micropiles

Reinforcement of all existing foundations on caissons, originally built in 1900÷1904. Each pier was consolidated by special injections in the masonry. The entire load was then transferred to new diaphragm wall panels (or micropiles) through the precompression on the pier of on all round concrete beam.